We manufacture from self-owned and licensed industrial premises in Sector 83, Noida — a modern facility with 24/7 backup power across 25,000 square feet of working area.

Capacity
25,000 sq ft
Self-owned, licensed industrial premises with 24/7 backup power and a licensed generator.
60,000 / month
Monthly production capacity across the facility with newly commissioned space.
50+ products
More than 50 different categories of products being produced in the premises.
Machinery
Juki · Brother · Pfaff · Pegasus · Jack · Hashima. UBT machines are used throughout stitching, giving cleaner finishing and reduced thread wastage.



Cut to pack, in-house
Separate sample and design department · In-house cutting · Production floor · Quality control · Finishing and packing. The complete cut-to-pack process runs in-house. We do not subcontract production. Your order does not leave our facility between fabric arrival and packed carton.



How production runs
- Fabric in — Fabric arrives from mill and is inspected before anything else happens.
- Cutting — In-house cutting against approved patterns and marker plans.
- Stitching — Line production with in-line quality checks at defined points.
- Finishing — Pressing, trimming and finishing to specification.
- Final QC and packing — Final inspection, metal detection on every garment, then packed to buyer specification.
Lead times
New bulk order
60–90 days from confirmation, including fabric procurement and pre production sampling.
Repeat order
45 days.
Timelines run from order confirmation and include mill fabric production, typically the longest single stage. Programmes using stock or regular fabrics and repeat styles move faster.
